Cap Finistere

The ISAR operations moved to the Cap Finistere in October 2010. The instrument is again on the starboard bridge wing, however unlike on the Pride of Bilbao, where the instrument was installed on the bridge roof, the installation on the Cap Finistere is on the bride walkway. This makes the on board maintenance a lot easier and simplifies the instruments exchange as the installation as a lot more accessible. The deployments on the Cap Finistere ended in July 2012 when the deployments were moved to the Pont Aven.

d96b37e25c18f40a